Action 1: By 2021, the first level RO concentrated water recovery and utilization in the entire plant will be completed, and a concentrated water recovery and utilization device will be added. The water originally discharged into the sewage pipe network will be recycled through the recovery device, saving 200 tons of tap water per day
Achievement 1: Save 269,000 yuan/year in water costs
Action 2: By 2021, the first level RO concentrated water recovery and utilization in the entire plant will be completed, and a concentrated water recovery and utilization device will be added. The water originally discharged into the sewage pipe network will be recycled through the recovery device, saving 200 tons of tap water per day
Achievement 2: Save 269,000 yuan/year in water costs
Action 3: Improvement of reuse of grinding wastewater in Phase II of 2021, saving 50000 tons/year of tap water
Achievement 3: Save 190,000 yuan/year on tap water costs
Action 1: The rooftop photovoltaic power generation project will be completed in 2023, with a total installed capacity of 2.3 megawatts
Achievement 1: Annual power generation of 3.06 million kWh, saving 2.445 million yuan/year in electricity costs and 3060 tons of CO2 emissions
Action 2: Complete the winter low-temperature cooling water recycling project in 2021, replacing the original ice machine refrigeration
Achievement 2: Save 4.5 million kilowatt hours of electricity, 3.3 million yuan/year of electricity bills, and 4500 tons of CO2 emissions
Action 3: In 2022, the replacement of water circulation vacuum pumps with screw vacuum pumps will be completed, and the motor power will be reduced from 90KW to 37KW per unit, with a total of five units per year
Achievement 3: Save 2.32 million kilowatt hours of electricity, 1.7 million yuan/year of electricity bills, and 2320 tons of CO2 emissions
Action 1: Energy saving for hydrogen containing tail gas recovery and utilization - The hydrogen containing tail gas from the Second and Third Plant has been changed from direct emission to being connected to the combustion boiler through pipelines. The tail gas is burned in the boiler to generate steam and transported to the existing steam main pipeline. The exhaust gas is discharged into the atmosphere through denitrification devices and energy-saving devices that meet the standards
Achievement 1: Annual steam production of 17000 tons, annual benefits of 4.6 million yuan, saving 2833 tons of standard coal and 7650 tons of CO2 emissions